Results 1 to 3 of 3

Thread: CPL Renewal

  1. #1
    Regular Member
    Join Date
    May 2008
    Location
    Lake Stevens, Washington, USA
    Posts
    65

    Post imported post

    I applied for my cpl renewal on may 5th it was alate renewal.It has never taking me this long before ever.Snohomish County Sheriff No less.What could be possibly be the problem?think they will take it the full 30 days?

  2. #2
    Campaign Veteran Right Wing Wacko's Avatar
    Join Date
    Aug 2007
    Location
    Marysville, Washington, USA
    Posts
    645

    Post imported post

    Sheriff Bart would have the permits out in a week to ten days. I sure hope sheriff Lovick does not change that policy.

    Has anyone else had any experiance with this new sheriff?

  3. #3
    Regular Member
    Join Date
    Dec 2006
    Location
    Everett, Washington, USA
    Posts
    3,339

    Post imported post

    I have not yet but based on comments that Lovick has made I would not put it past him to wait the full 30 days.
    "A fear of weapons is a sign of retarded sexual and emotional maturity."

    "though I walk through the valley in the shadow of death, I fear no evil, for I know that you are by my side" Glock 23:40

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •