mkl
Regular Member
imported post
I applied on 2/07/2008 in Arlington...
Saturday would be my 45 day limit, so I was hoping to get my permit this past Friday on day 44. Called the circuit court around 1-2, but the woman said it still had not been returned. I asked if there was any chance she would get it and have it for me before the end of the day, but she said it was such a nice day that even if she got it, there wouldn't be a judge in the building to sign in. After asking her what the proceedure would be for a temporary permit she told me to call back on Monday and ask for status and tell them if I wanted a temporary permit.
I called today and it is still not ready. He said it would probably be later this week. Then I asked about a temporary permit, but the person who I was talking to was new and didn't know about them. He went to ask a senior employee, who told him they could infact do a temporary permit. However, the supervisor was out, so I can't get my temp permit today, I have to call back tomorrow.
Maybe day 48 will be the lucky number...Do they usually get permits out before the 45 day limit in Arlington?
I applied on 2/07/2008 in Arlington...
Saturday would be my 45 day limit, so I was hoping to get my permit this past Friday on day 44. Called the circuit court around 1-2, but the woman said it still had not been returned. I asked if there was any chance she would get it and have it for me before the end of the day, but she said it was such a nice day that even if she got it, there wouldn't be a judge in the building to sign in. After asking her what the proceedure would be for a temporary permit she told me to call back on Monday and ask for status and tell them if I wanted a temporary permit.
I called today and it is still not ready. He said it would probably be later this week. Then I asked about a temporary permit, but the person who I was talking to was new and didn't know about them. He went to ask a senior employee, who told him they could infact do a temporary permit. However, the supervisor was out, so I can't get my temp permit today, I have to call back tomorrow.
Maybe day 48 will be the lucky number...Do they usually get permits out before the 45 day limit in Arlington?